Planning or Learning: Reliability and Cost in Multi-Asset Maintenance
Xian Yeow Lee, Chandrasekar Venkatraman, Ahmed Farahat · September 11, 2026
arxiv descriptive medium evidence 7/10 relevance Full text usable extracted full text Source PDF

Structured author observations

Linked only from stored provider relations; the raw author line above is never matched by name.

Arxiv

Latest observation:

  1. Xian Yeow Lee unresolved corpus identity
  2. Chandrasekar Venkatraman unresolved corpus identity
  3. Ahmed Farahat unresolved corpus identity

Semantic Scholar

Latest observation:

  1. X. Lee provider ID
  2. Chandrasekar Venkatraman provider ID
  3. Ahmed K. Farahat provider ID
Under a unified benchmark for multi-asset bearing maintenance, planning with a hard zero-failure constraint yields zero-failure schedules insensitive to failure-penalty magnitude, while RL optimizes expected cost and commonly trades occasional failures for lower maintenance cost, with lightweight reliability fixes reducing but not eliminating this gap.

Citation observations

Cumulative provider counts captured on specific dates; providers are never combined.

Industrial maintenance systems involve multiple interacting assets and shared resources, making it challenging to balance reliability and operational cost using a single decision framework. While recent work has focused on reinforcement learning (RL) for maintenance scheduling, direct comparisons with planning approaches under identical settings remain limited. In this work, we empirically compare planning and RL for multi-asset bearing maintenance using run-to-failure data. We examine how these methods behave when balancing preventive maintenance against tolerable failures across a range of failure penalty scenarios. We observed a consistent behavioral difference driven by objective formulation. Planning enforces reliability as a hard constraint and produces zero-failure policies whose total cost is largely insensitive to the magnitude of failure penalties. RL agents optimize expected cost and often trade off preventive maintenance against occasional failures as penalties vary, resulting in lower costs under low-penalty regimes but persistent non-zero failures even when penalties are high. We also investigate lightweight constraint mechanisms, including reward shaping and action masking, to encourage RL's reliability. From a practical perspective, planning may be more suitable when strict reliability is required and deployment horizons are short, whereas RL may provide cost-efficient policies when limited failures are acceptable and long-run operational efficiency is prioritized. Overall, this study clarifies the trade-offs between reliability and cost in multi-asset maintenance and suggests that planning and RL are complementary approaches. Beyond these findings, the controlled benchmark protocol itself that unifies environment, cost model, and evaluation across paradigms, offers a reusable template for comparing decision-making approaches in other maintenance settings.

Summary

Main Finding

Planning (finite-horizon search with a hard zero-failure constraint) and reinforcement learning (DQN/PPO optimizing discounted expected cost) produce systematically different maintenance policies in multi-asset scheduling. Planning enforces zero-failure schedules (when feasible) and is insensitive to failure-penalty magnitude; RL treats failures as soft costs and trades preventive maintenance against tolerable failures, yielding lower cost under low-penalty regimes but persistent non-zero failures even when penalties are large. Lightweight fixes for RL (reward shaping, action masking) reduce but do not eliminate this reliability gap. The paper also delivers a controlled benchmark unifying environment, cost model, and evaluation for comparing approaches.

Key Points

  • Objective formulation drives behavior:
    • Planner uses a hard constraint that forbids any failure in the planning horizon → zero-failure policies (if feasible), independent of failure penalty cf.
    • RL minimizes discounted expected cost → may accept occasional failures if maintenance cost and discounting make prevention suboptimal.
  • Empirical pattern:
    • Under low cf, RL often outperforms planner in total cost by accepting rare failures.
    • Under high cf (safety-critical), planner still produces zero-failure schedules while RL policies often continue to incur some failures.
  • Discounting and horizon mismatch:
    • Discount factor and finite lookahead create a structural bias in RL toward deferring maintenance when asset lifetimes exceed the effective discount horizon, increasing failure risk.
  • Lightweight reliability mechanisms:
    • Reward shaping (amplifying failure penalty during training) had negligible effect on failure rates at evaluation.
    • Action masking (forbidding no-op when any asset falls below a threshold) reduced failures but substantially increased total cost, and did not fully close the gap to planning.
  • Practical recommendation:
    • Use planning when strict zero-failure reliability is required or deployment horizons are short and dynamics are well modeled.
    • Use RL when occasional failures are acceptable, uncertainty favors learned policies, and long-run operational efficiency is prioritized.
  • Benchmark contribution:
    • The authors release a unified protocol (environment, cost model, evaluation) for comparing planning and learning in maintenance, enabling reproducible controlled studies.

Data & Methods

  • Environment / system:
    • Multi-bearing maintenance problem with N = 6 run-to-failure bearings operating in parallel and a single shared maintenance crew (at most one bearing serviced per time step).
    • Two post-maintenance dynamics: oracle (reset to original recorded run) and estimated (sampled from fitted log-normal lifetime distribution).
    • Observation mappings: continuous normalized remaining useful life (RUL) + failure flag, and a discrete four-state health categorization (healthy, degrading, critical, failed).
  • Dataset:
    • Run-to-failure bearing dataset (Nectoux et al. 2012) with six trajectories; lifetimes: 515, 797, 871, 911, 1637, 2803 recording windows (10 s per window).
    • Episodes simulated with 8000 steps (longer than observed lifetimes to allow failures if no maintenance).
  • Cost model:
    • Per-step operating cost per active bearing cop = 1.0.
    • Fixed maintenance action cost cm = 25.0.
    • Failure penalty cf varied across {100, 500, 1000, 5000, 10000} to span low to high risk regimes.
    • Total cost summed over episode: operating + maintenance + cf × newly failed bearings.
  • Planning baseline:
    • Dijkstra / uniform-cost search over a finite-horizon H = 20 joint state space with a hard infinite cost assigned to any state containing a failure (i.e., zero-failure constraint). Receding-horizon execution: execute first action then replan.
    • Rule-based threshold policy also included as a heuristic baseline.
  • RL baselines:
    • DQN (value-based) and PPO (policy-gradient), 2-layer MLPs (64 units), ReLU; observation = normalized RUL + failure flag for each bearing.
    • Training protocol: DQN 1500 episodes, PPO 1000 episodes, 3 seeds, discount γ = 0.99 (default), replay and PPO hyperparameters as standard.
  • Reliability mechanisms tested for RL:
    • Reward shaping: amplify failure penalty during training only.
    • Action masking: forbid no-op when any non-failed bearing’s normalized remaining life < δ (δ = 0.25), applied during training and eval.
  • Evaluation:
    • Compare total cost and failure counts across cf regimes, oracle vs estimated post-maintenance dynamics, and methods.

Implications for AI Economics

  • Trade-off between reliability and cost is fundamentally shaped by objective specification:
    • When operators value strict reliability (large implicit or explicit penalty for failures), planning formulations with hard constraints better align incentives and guarantee zero-failure behavior (when feasible). This yields predictable operational costs that are insensitive to the numeric failure-penalty parameter.
    • When operators accept occasional failures to reduce maintenance spending (risk-tolerant regime), RL can produce lower expected operational costs by optimizing the trade-off under uncertainty.
  • Economic decision-making must account for horizon and discounting effects:
    • Discounted RL may underweight very long-run failure risks, biasing toward deferred maintenance; correspondingly, choice of discount factor (or switching to average-reward / risk-sensitive formulations) materially affects economically optimal policies.
  • Practical method selection depends on organizational objectives and constraints:
    • Use planning for short-term deployments, well-modeled dynamics, and strict safety/regulatory constraints.
    • Use RL for long-running operations with stochastic dynamics and where learning from data can capture complex interactions and yield cost efficiencies—provided acceptable failure rates.
  • Policy design and governance:
    • Numeric penalties (cf) alone may not suffice to enforce reliability under learning-based methods. Organizations must decide whether to encode reliability via constraints (planning or CMDP) or accept probabilistic guarantees from RL.
    • Lightweight fixes (shaping, masking) have trade-offs: masking raises costs; shaping may have limited impact. For high-assurance contexts, invest in constrained optimization methods (CMDPs, shielding) or hybrid approaches.
  • Economic value of benchmarks:
    • The paper’s unified benchmark enables apples-to-apples comparisons and can inform procurement and technology selection decisions by quantifying cost–reliability trade-offs across methods.
  • Limitations that affect economic interpretation:
    • Small-scale dataset (six bearings) and planner horizon cap limit direct scalability claims; computational cost of planning and training/maintenance of learned policies must be included in full economic analyses.
    • The planner’s advantage depends on feasibility of zero-failure schedules and accuracy of degradation models; in highly stochastic or poorly modeled settings, RL’s robustness to model misspecification may outweigh planners’ guarantees.

Overall, for AI economics and operations planning: explicitly choose the decision paradigm according to acceptable failure risk, model fidelity, planning/compute budgets, and time horizon; consider constrained or risk-aware RL formulations or hybrid planning+learning pipelines when both reliability and long-run efficiency matter.

Assessment

Paper Typedescriptive Evidence Strengthmedium — The paper reports controlled simulation experiments on a shared run-to-failure bearing dataset, directly comparing planning and RL under a unified environment and cost model; this provides credible within-environment evidence about behavioral differences between methods but is limited by a small empirical sample (six bearings), simulated rather than field deployment, and a narrow set of algorithms and hyperparameters. Methods Rigormedium — The authors establish a clear, reproducible benchmark (shared environment, cost function, oracle vs estimated post-maintenance dynamics), use multiple RL algorithms (DQN, PPO), baseline heuristics, and multiple random seeds; however, the dataset is small (six trajectories), the planner uses a finite horizon (H=20) that may constrain outcomes, only lightweight constraint mechanisms are tested, and results are from simulation without field validation. SampleExperiments use the training portion of the Nectoux et al. (run-to-failure) bearing dataset: six bearing trajectories with lifetimes {515, 797, 871, 911, 1637, 2803} 10-second windows; episodes simulate all six bearings in parallel for 8000 steps with at most one maintenance action per step (single shared crew); post-maintenance dynamics evaluated under two regimes—oracle reset to original trajectory and stochastic resampling from a fitted log-normal; costs use cop=1.0, cm=25.0, and cf ∈ {100, 500, 1000, 5000, 10000}; planning uses Dijkstra with H=20; RL uses DQN (1500 episodes) and PPO (1000 episodes) across three seeds. Themesproductivity adoption GeneralizabilitySmall sample: only six run-to-failure trajectories, limiting statistical diversity of degradation patterns., Dataset laboratory/testbed bearings (Nectoux) may not reflect field heterogeneity, environmental variability, or scale., Single shared-crew constraint (at most one maintenance per step) may not generalize to settings with parallel crews or varying service time., Oracle post-maintenance dynamics are idealized; estimated dynamics use a simple log-normal fit and may underrepresent real repair uncertainty., Planner horizon (H=20) and search choices may bias planning performance relative to scalable industrial planners., Only two RL algorithms (DQN, PPO) and two lightweight constraint mechanisms evaluated; other formulations (CMDPs, average-reward, risk-sensitive) are not tested., Cost model fixed except for cf; real-world cost structures and downtime impacts may differ., No field/online deployment or human-in-the-loop validation to demonstrate real-world operational performance.

Claims (6)

ClaimDirectionOutcomeConfidence & EvidenceDetails
The planning method enforces reliability as a hard zero-failure constraint and therefore produces zero-failure schedules whenever such schedules are feasible. Error Rate positive Number of bearing failures under the resulting maintenance schedule
Reading fidelity high
Study strength high
n=6
zero failures
0.3
The planner's decisions are insensitive to the magnitude of the failure penalty because failures are prohibited rather than traded off against maintenance cost. Organizational Efficiency null_result Dependence of planning decisions and total schedule cost on the failure penalty
Reading fidelity high
Study strength high
n=6
independent of cf
0.3
RL agents optimize expected discounted cost and may trade preventive maintenance against occasional failures as the failure penalty changes. Task Allocation mixed Trade-off between preventive-maintenance actions, total operational cost, and failure occurrences
Reading fidelity high
Study strength medium
n=6
cf = {100, 500, 1000, 5000, 10000}
0.18
Relative to planning, RL produces lower-cost policies in low-failure-penalty regimes but retains non-zero failures even when failure penalties are high. Organizational Efficiency mixed Total maintenance and operating cost and number of bearing failures
Reading fidelity high
Study strength medium
n=6
lower costs under low-penalty regimes; persistent non-zero failures at high penalties
0.18
Reward shaping has negligible effect on RL failure behavior, while action masking reduces failures more substantially but adds significant cost overhead; neither method eliminates the reliability gap relative to planning. Error Rate mixed Failure count and total maintenance/operating cost under RL constraint mechanisms
Reading fidelity high
Study strength medium
n=6
negligible effect for reward shaping; more substantial failure reduction with action masking
0.18
Planning may be more appropriate when strict reliability is required, whereas RL may be preferable when limited failures are acceptable and long-run operational efficiency is prioritized. Task Allocation mixed Suitability of planning versus RL as a function of reliability requirements, tolerated failures, and operating horizon
Reading fidelity high
Study strength speculative
n=6
0.03

Notes