The Commonplace
Home Papers Evidence Explore Trends Syntheses Digests References Docs 🎲 Workforce Futures
← Papers
Direction, evidence grade, and study type are AI-generated labels (gpt-5-mini), not human-verified. Syntheses are LLM-written. "Tensions" are machine-detected candidates, not confirmed contradictions. A research-acceleration tool, not peer review. How this is built →

For US AI data centres, the wire still wins: once reliability charges and firm-grid relationships are included, on-site generation costs exceed the delivered grid in all modeled scenarios—combined-cycle gas costs about $114/MWh complete-site versus a $92/MWh delivered grid, while hydrogen-based options remain two-to-six times costlier even under aggressive electrolyser learning.

Beyond the Grid: Cost, Carbon, and Capital Requirements of On-Site Power Technologies for AI Data Centers
Eliseo Curcio · August 08, 2026
arxiv descriptive medium evidence 8/10 relevance Full text usable extracted full text Source PDF

Structured author observations

Linked only from stored provider relations; the raw author line above is never matched by name.

Arxiv

Latest observation:

  1. Eliseo Curcio unresolved corpus identity

Semantic Scholar

Latest observation:

  1. Eliseo Curcio provider ID
When accounting for measured AI training loads, retained grid capacity/network charges, and an endogenous delivered-grid price, no on-site generation technology examined (including gas, storage, or hydrogen) undercuts the delivered grid on a complete-site basis, with hydrogen options remaining multiple times more expensive.

Citation observations

Cumulative provider counts captured on specific dates; providers are never combined.

Interconnection queues, not electricity prices, now govern where data centers can be built, and the standard levelized-cost comparison answers a question no developer faces: it assumes a load profile, freezes the grid price while modeling the demand that moves it, and quotes busbar costs a facility cannot buy. This paper evaluates nine on-site supply technologies against a delivered grid whose price is endogenous to projected data-center demand, on a complete-site basis that retains standby charges, with measured GPU training load, delivered fuel prices, production-pathway carbon, and statutory 45V and 48E incentive mechanics. Nothing beats the wire: gas combined cycle produces at 47 USD/MWh but costs about 114 USD per megawatt-hour of complete site energy against a 92 USD grid; four-hour storage is physically capped near 18 percent of annual energy and, charged at the margin, dirtier than the grid; hydrogen from grid-priced power fails on cost and carbon together. An investment inversion converts these findings into capital terms: conversion-hardware learning buys nothing, because free hardware still exceeds the grid for every low-carbon arm, while global electrolyser deployment on sited sub-20 USD/MWh power brings PEM hydrogen power to about 2.2 times the grid at 300 billion USD and 1.9 times at 1 trillion USD (2.7 and 2.3 for the hydrogen engine), with a carbon reduction of roughly 85 percent (6.8-fold) against grid-power production. Grid parity is not purchasable at any budget. On-site supply is an access and depth product; most current investment targets the wrong term.

Summary

Main Finding

On a complete-site basis (including retained grid capacity/network charges and measured GPU training load), no on-site supply technology in the paper’s sample beats the delivered grid in the modeled U.S. 2030–2040 scenarios. Even though some generators (e.g., combined‑cycle gas) have low busbar costs, once the facility keeps the grid for peaks, outages, and reserve capacity the total delivered cost to the data center exceeds the grid tariff. Hydrogen pathways only approach competitiveness—at roughly 2× the delivered grid—after massive electrolyser deployment and large public/private capital (hundreds of billions to trillions USD), and storage is physically limited in annual energy share and often dirtier than the grid when charged at the margin.

Key Points

  • Accounting choice matters: comparing busbar LCOE to a fixed grid price answers a question developers don’t face. This paper prices technologies against an endogenous delivered-grid tariff and on a complete-site basis (so fixed grid charges largely remain).
  • Measured AI load: accelerator telemetry (A100-class RL training) shows fast, high-amplitude ramps (majority of samples exceed ±200 W/s). Rather than exclude slow generators, the model prices a small battery buffer for generator response time (an adder of ~$0.9–$3/MWh).
  • Endogenous grid: projected data-center demand is routed into the power sector (60% of incremental load → gas burn) which raises gas prices and escalates capacity/network charges; the delivered grid price rises with the modeled demand (reference: ~$74/MWh in 2026 → ~$92/MWh in 2030).
  • Complete-site vs busbar: example—combined-cycle gas busbar LCOE ≈ $47/MWh (2030), but the complete-site cost with retained grid ≈ $114/MWh, i.e., about $21–$22/MWh above the delivered grid ($92/MWh).
  • Storage limits: 4‑hour lithium BESS has a practical annual-energy cap (~17.8% / 16% CF at realistic cycling) and, when charged at the margin, can be dirtier than the grid. Corrected incremental-charging cost ≈ $118/MWh (at physical ceiling).
  • Hydrogen economics: electrolytic hydrogen requires very low-priced power (~$20/MWh) to approach competitive production cost. Under an optimistic S4 scenario (co‑located electrolysis on curtailed renewables + tax credit), delivered H2 can fall to ~$3.8/kg and hydrogen power ~1.9–2.2× the grid, but that requires large-scale electrolyser deployment and policy support.
  • Investment inversion: the paper computes the capital required (via Wright’s‑law learning) to push costs down. Key result: conversion-hardware learning alone cannot buy parity—global electrolyser deployment on sub-$20/MWh power would still leave hydrogen power ~2× the grid, and bringing parity is not purchasable at any realistic budget in the model.
  • Policy mechanics: Section 45V (clean-H2 PTC) and Section 48E (investment tax credit for zero-GHG assets) materially affect hydrogen and storage economics, but eligibility and tiering limit their reach; they improve but do not create grid parity.

Data & Methods

  • Technology set: nine supply technologies — combined-cycle gas, gas peakers, 4‑hour Li-ion storage, SOFC (pipeline NG & RNG), PEM fuel cell (delivered H2), H2 reciprocating engine, RNG reciprocating engine, HVO genset.
  • Parameter sources: published cost surveys, vendor deployment data, national-lab lab costings, lifecycle-assessment literature. Minimum practical unit sizes enforced.
  • Load data: measured accelerator power telemetry from reinforcement‑learning training runs on A100-class hardware. Facility load constructed via bootstrap with appropriate block length; generator ramp gaps bridged by a priced battery buffer sized to generator response time.
  • Cost model: annuity LCOE at 7.7% WACC with technology-specific lifetimes, O&M, delivered fuel prices, compliance carbon pricing applied to stack emissions only; lifecycle carbon reported separately. Storage modeled as a system component; charging uses incremental (marginal) tariff.
  • Endogenous coupling: incremental DC demand routed to power-sector gas (60% of increment) with supply elasticity 0.35; peak-demand growth escalates capacity/network charges at 5× proportional rate up to a cap (1.6× 2026 charge). This produces delivered-grid prices that rise with DC demand.
  • Scenarios: four main scenarios (S1 Reference; S2 Grid-constrained/high gas; S3 Carbon‑priced; S4 Hydrogen-scales with $20/MWh electrolyser power and production tax credit). Hydrogen price is derived (not assumed) from electrolyser capital costs under Wright’s law plus electricity price.
  • Representative quantitative outcomes (2030 reference):
    • Delivered grid (endogenous): ~$92/MWh
    • Combined-cycle gas busbar: $47/MWh; complete-site: $114/MWh; lifecycle CI ≈ 431 gCO2e/kWh
    • 4‑hr BESS incremental charging LCOE: $118/MWh; complete-site priced at its physical annual-energy cap (~17.8%)
    • PEM fuel cell (delivered H2): busbar ≈ $490/MWh; complete-site ≈ $556/MWh; lifecycle CI ≈ 915 gCO2e/kWh
    • Hydrogen delivered prices vary across scenarios (e.g., ~ $3.8/kg in S4; ≈ $7–8/kg in reference)
  • Open reproducibility: model, revision log, and workbook reproducing tables are released with the paper.

Implications for AI Economics

  • Siting and total cost of ownership: developers cannot treat generator busbar LCOE as the facility-level electricity cost. Complete-site accounting is necessary for realistic comparisons; availability of the wire is an economic as well as access constraint (interconnection queues drive decisions).
  • Investment priority: the most valuable investments for reducing AI data-center electricity cost are not necessarily conversion hardware (electrolysers, fuel cells). Instead, addressing interconnection bottlenecks, expanding transmission and local distribution capacity, and securing access to very low‑cost curtailed renewables (for cheap electrolysis) provide more leverage.
  • Role of natural gas: on-site combined-cycle gas is the lowest-cost on-site generation in many scenarios but still typically more expensive than the retained-grid delivered energy. Where the wire isn’t available (interconnection scarcity), on-site gas may be the pragmatic option despite higher complete-site cost.
  • Storage and demand-shaping: four‑hour batteries have constrained contribution to annual energy (~≤18%) and, when charged at the incremental margin, can increase facility carbon intensity. However, small buffer batteries are inexpensive relative to energy and necessary to bridge generator response for AI loads—so operational design (power control, flexible scheduling) that allows buying curtailed renewables or shaping training load matters more.
  • Hydrogen as deep decarbonization path: hydrogen-based on-site power can provide deep carbon reductions (model shows ~85% lifecycle reduction relative to grid-power production in optimistic deployments) but at very high cost and very large capital deployment. Hydrogen can be part of a long-run decarbonization strategy, but it is not a near-term route to grid parity for AI loads without unrealistic budgets or systemic changes to power prices.
  • Policy design considerations: tax credits and production incentives (45V/48E) materially affect cost trajectories but do not eliminate the fundamental gap for most technologies; careful eligibility, tier design, and duration influence whether incentives meaningfully alter siting decisions.
  • Modeling guidance for AI economists: (1) use measured load profiles for LCOE comparisons and price buffers for generator response times; (2) compare against an endogenous delivered-grid tariff when demand is large enough to affect the market; (3) conduct investment-inversion analyses to answer “how much money and where must it flow to change the ranking?”

Limitations noted by the paper: the gas-price fit is the weakest model element (limited data for long-run exports), solar logistic ceiling is a key driver of grid carbon outcomes, and elasticities/judgments (e.g., 60% of incremental DC load → gas, network escalation multiplier) are transparent but uncertain—sensitivity analysis is provided.

Assessment

Paper Typedescriptive Evidence Strengthmedium — The paper combines measured AI training load telemetry, detailed technology cost and lifecycle inputs, an endogenous grid-price model, and scenario/sensitivity analysis with released code and reproducing workbooks — giving it substantive, model-based evidence. However, key results depend on fitted parameters and judgment calls (supply elasticities, gas-price path, solar logistic ceiling, assumptions about retaining firm grid relationships and capacity charges), so conclusions are contingent on those assumptions rather than on external causal validation. Methods Rigorhigh — Uses empirical telemetry for load characterization (with block bootstrap to preserve autocorrelation), prices ramp-buffering rather than excluding generators, endogenizes delivered grid price via demand-to-price coupling, uses published cost and LCA sources, implements policy credits per guidance, and reports scenario and sensitivity analyses; code and data/workbook are released for reproducibility. Remaining weaknesses are acknowledged (notably the gas-path fit, choice of elasticities, and scenario ceilings) but are generally explored via sensitivity checks. SampleMeasured power telemetry from three reinforcement-learning GPU training runs on A100-class hardware (including a 72B-parameter run); techno-economic and lifecycle inputs drawn from published LCOE surveys, vendor deployment data, national-lab costings, and LCA literature; historical time series for generation shares, Henry Hub gas prices, and allowance auction clearings used to fit scenario drivers. Themesadoption innovation GeneralizabilityUS-focused market structure, policy (45V/48E) and tariff architecture — results may not transfer to other countries or regulated terrains, Relies on measured loads from specific A100-class training runs; differing hardware, workloads, or future load-shaping capabilities could change buffer and dispatch requirements, Key scenario outcomes sensitive to fitted parameters (gas-price path, supply elasticity, solar logistic ceiling) and judgment choices (proportional escalation of capacity/network charges), limiting projection certainty, Assumes a typical retained firm grid relationship; alternative contractual arrangements (e.g., full islanding, long-term PPAs, or microgrid approvals) could materially alter complete-site economics, Technology cost and learning assumptions (electrolyser/stack learning rates, fuel supply logistics) may change with future deployments, affecting hydrogen comparators

Claims (12)

ClaimDirectionOutcomeConfidence & EvidenceDetails
The modeled delivered-grid price rises from $73.8/MWh in 2026 to $91.8/MWh in 2030 and $98.4/MWh by 2040 in the reference scenario because of projected data-center demand. Organizational Efficiency negative Delivered electricity cost for data centers
Reading fidelity high
Study strength medium
$18.0/MWh increase from 2026 to 2030; $24.6/MWh increase from 2026 to 2040
0.18
A gas combined-cycle plant has a busbar cost of $47/MWh but a complete-site cost of approximately $114/MWh when the data center retains its firm grid relationship. Organizational Efficiency negative Complete-site electricity cost
Reading fidelity high
Study strength medium
$67/MWh difference between busbar and complete-site cost
0.18
None of the nine modeled on-site technologies beats the delivered grid on a complete-site basis in any modeled scenario or year. Organizational Efficiency negative On-site electricity cost relative to delivered grid cost
Reading fidelity high
Study strength medium
n=9
0.18
Four-hour lithium-ion storage is physically limited to approximately 17.8% of annual site energy under the modeled once-daily cycling schedule. Task Allocation negative Maximum annual energy supplied by four-hour storage
Reading fidelity high
Study strength high
17.8% annual-energy cap
0.3
At its physical ceiling, grid-charged four-hour storage costs $118/MWh and has lifecycle emissions of 557 gCO2e/kWh, exceeding the reference delivered grid's $92/MWh and 266 gCO2e/kWh. Firm Productivity negative Storage electricity cost and lifecycle carbon intensity
Reading fidelity high
Study strength medium
$26/MWh higher cost and 291 gCO2e/kWh higher lifecycle emissions than the grid
0.18
Hydrogen produced using grid-priced electricity is substantially more expensive and more carbon-intensive than the delivered grid in the reference scenario. Organizational Efficiency negative Complete-site electricity cost and lifecycle carbon intensity
Reading fidelity high
Study strength medium
n=2
PEM fuel cell: $556/MWh and 915 gCO2e/kWh; hydrogen engine: $676/MWh and 1,144 gCO2e/kWh
0.18
Under the constrained scenario, the delivered grid reaches $150/MWh in 2030 and $161/MWh in 2040, while the complete-site gas premium narrows to roughly 11–13% but does not disappear. Organizational Efficiency mixed Relative complete-site cost of on-site gas generation versus grid electricity
Reading fidelity high
Study strength low
11–13% premium for complete-site gas generation
0.09
Global electrolyzer deployment powered by sited electricity below $20/MWh does not achieve hydrogen-powered electricity parity with the grid, even at $1 trillion of cumulative investment. Organizational Efficiency negative Hydrogen-powered electricity cost relative to grid electricity
Reading fidelity high
Study strength low
PEM hydrogen power remains 2.2 times the grid at $300 billion and 1.9 times at $1 trillion
0.09
The modeled hydrogen investment scenarios reduce carbon emissions by approximately 85% relative to grid-power hydrogen production, despite failing to reach cost parity. Firm Productivity positive Carbon emissions from hydrogen-powered electricity production
Reading fidelity high
Study strength low
roughly 85% carbon reduction; 6.8-fold reduction
0.09
The measured AI training load is highly variable: 53.2% of samples from a 72-billion-parameter training run exceed a ramp rate of ±200 W/s. Automation Exposure negative AI training power-load ramp rate
Reading fidelity high
Study strength medium
53.2% of samples exceed ±200 W/s
0.18
Pricing a buffer battery rather than excluding slow generators outright adds approximately $0.9/MWh at high duty and about $3/MWh under a 100% swing assumption. Organizational Efficiency positive Incremental cost of accommodating AI-load ramping
Reading fidelity high
Study strength medium
$0.9/MWh at high duty; about $3/MWh at a 100%-swing assumption
0.18
The modeled grid-carbon-intensity decline is 3.7% per year through 2040, with the 2040 intensity ranging from 262 to 192 gCO2e/kWh depending on the assumed terminal solar share. Firm Productivity positive Grid lifecycle carbon intensity
Reading fidelity high
Study strength low
3.7% annual decline; 2040 range of 262–192 gCO2e/kWh
0.09

Notes